ARBEL MAKARNA
Epoxy flooring for food production
A continuous, cleanable 3 mm self-levelling epoxy surface was installed around machinery and across production corridors.
Explore industrial systems →We present projects through substrate condition, operating requirements, system selection and application scope—not through finish photography alone.
Each area is engineered according to substrate and operating conditions.
ARBEL MAKARNA
A continuous, cleanable 3 mm self-levelling epoxy surface was installed around machinery and across production corridors.
Explore industrial systems →
PARKING
Ramps, turning areas, slip resistance, water and line marking form one project scope.
Request evaluation →
COMMERCIAL
Appearance, cleanability, pedestrian traffic and operating schedule guide the system choice.
Explore systems →
WAREHOUSE
Forklift routes, rack bases, impact zones and shipment traffic define the required performance.
Request evaluation →Team and phase planning is defined around area, substrate condition, operational traffic and available working hours.
Preparation is specified separately for new concrete, existing concrete and previously coated surfaces.
One team can apply up to 1,000 m² per day under suitable site and substrate conditions.
The area can be divided into phases so operations continue wherever the work sequence allows.
Fast-curing systems can reopen to pedestrian traffic the next morning under suitable conditions.
Final capacity and return-to-service time are confirmed after technical review of preparation, temperature, moisture, system and site organisation.
Discuss a large-scale projectVerified scope, approved images and reference details are shared when appropriate.