Home / Projects

Every substrate has a different problem. The system logic should be visible.

We present projects through substrate condition, operating requirements, system selection and application scope—not through finish photography alone.

Completed epoxy floor application at Arbel Makarna production facility
Arbel Makarna · 3 mm self-levelling epoxy floor
Application areas

Project scopes shaped by real use.

Each area is engineered according to substrate and operating conditions.

Completed glossy epoxy floor at Arbel Makarna production areaARBEL MAKARNA

Epoxy flooring for food production

A continuous, cleanable 3 mm self-levelling epoxy surface was installed around machinery and across production corridors.

Explore industrial systems →
Parking floor and markingsPARKING

Parking and vehicle traffic

Ramps, turning areas, slip resistance, water and line marking form one project scope.

Request evaluation →
Retail floor coatingCOMMERCIAL

Retail and commercial spaces

Appearance, cleanability, pedestrian traffic and operating schedule guide the system choice.

Explore systems →
Industrial floor in a high-rack warehouse aisleWAREHOUSE

Warehouses and logistics

Forklift routes, rack bases, impact zones and shipment traffic define the required performance.

Request evaluation →
Large-scale application planning

Phased systems designed around an operating facility.

Team and phase planning is defined around area, substrate condition, operational traffic and available working hours.

01New or existing concrete

Preparation is specified separately for new concrete, existing concrete and previously coated surfaces.

02Up to 1,000 m² per day

One team can apply up to 1,000 m² per day under suitable site and substrate conditions.

03Phased work in operating sites

The area can be divided into phases so operations continue wherever the work sequence allows.

04Night application, morning access

Fast-curing systems can reopen to pedestrian traffic the next morning under suitable conditions.

Final capacity and return-to-service time are confirmed after technical review of preparation, temperature, moisture, system and site organisation.

Discuss a large-scale project
Selected references

Field experience across industries.

Verified scope, approved images and reference details are shared when appropriate.